Resident Experience
During Installation
Aeroseal Duct creates no mess and is typically completed in a couple of hours for homeowners. For commercial and high-rise duct sealing, there is minimal disruption to residents with no demolition required. AeroBarrier is typically implemented in unoccupied areas, but if done in occupied spaces, would require several hours to days depending on the scope of work, to prep and cover finished surfaces such as counters, flooring, and windows. No demolition is required, and no residue or mess is left behind upon completion.
Post Installation
Improved comfort & indoor air quality
Even temperatures room to room
Reduced odor transfer between units
Less noise traveling through leaky pathways
Cleaner, controlled airflow
HVAC systems that perform as designed